One rush order used to cost this shop an entire afternoon of replanning

Request a Walkthrough
Job Shop SchedulingProduction PlanningRush Order ManagementReal-Time SchedulingShop Floor VisibilityProduction ReportingCapacity Planning
The Setup

Inside the Operation

A make-to-order machining shop producing precision metal parts for industrial and automotive clients. The whole week's plan lived in one spreadsheet, run by one planner — workable until a big customer asked for an order sooner than promised.

Inside the Operation
18
CNC & manual machines
35–45
active jobs/week
1 Planner
Spreadsheet-based
The Problems

Four ways the old system cost them every single week.

Manual planning created constant uncertainty, single-person dependency, and invisible capacity gaps across the shop floor.

A single rush order meant an afternoon of manually reworking the whole week's spreadsheet by hand.
Only the planner knew the real schedule, so nothing could move when they were away.
Capacity was a rough guess - no one could see which machines had room and which were overbooked.
Every change had to be re-checked by hand, and mistakes weren't caught until the floor fell behind.
The Change

What Changed With Smart PPS

crm-feat-3.svg

Rush orders slot in automatically

A sooner-than-planned order gets fitted into the schedule on its own — no manual rework.

crm-feat-6.svg

The plan updates itself in real time

A machine going down triggers an immediate reschedule, not a wait until someone notices.

crm-feat-1.svg

The floor can see the plan too

A shop-floor screen shows the live schedule, so the plan isn't locked in one person's head.

Estimated Impact

The Potential Impact of Smarter Planning

Estimated ranges based on typical job-shop scheduling scenarios — not measured results from a specific customer

The Potential Impact of Smarter Planning
60–70%
Time spent replanning each week
15-20%
Machine idle time
Hrs → Min
Rush-order rework turnaround
1 → All
People who can see the real schedule