Advanced Production Scheduling

Three customers, one machine and no way to tell whose order came first.

Request a Walkthrough
Job Shop SchedulingProduction PlanningRush Order ManagementReal-Time SchedulingShop Floor VisibilityProduction ReportingCapacity Planning
The Setup

Inside the Operation

A shop that makes shafts, housings, and turned parts for three car-industry customers. Each customer has its own delivery dates and its own priority level. The same machines make many different parts, so switching from one part to another takes different amounts of time depending on what ran before it.

Inside the Operation
26
CNC machines
3
Customers, different priority levels
40+
Parts made regularly
The Problems

Four ways the old system cost them every single week.

Planning relied on manual decisions, fixed assumptions, and delayed updates, making schedules difficult to optimise or adjust.

With three customers sharing the same machines, no one could tell whose order should run first.
Changeover times varied by part, but the plan assumed fixed durations that rarely matched reality.
Priorities lived in people's heads, so urgent jobs slipped behind lower-value work.
By the time the schedule was updated, conditions on the floor had already moved on.
The Change

What Changed With Smart PPS

crm-feat-3.svg

Priority, setup, and run time together

Builds the schedule using what matters most, real changeover time, and runtime, all at once, instead of guessing by hand.

crm-feat-6.svg

Priority set once, followed every time

Each customer's priority is entered once. Urgent orders move ahead of routine ones automatically.

crm-feat-1.svg

Reacts when a machine goes down

The moment a machine breaks down, affected jobs shift to another machine or time – no waiting for someone to catch it.

Estimated Impact

How Smarter Scheduling Can Improve Performance

These are estimated ranges based on typical scheduling situations like this — not measured results from one specific customer.

How Smarter Scheduling Can Improve Performance
20–30%
Hours lost to unplanned changeover time
15-20%
Orders delivered late to customers
Hrs → Min
Time to update the plan after a breakdown
Try → Use
New rules can be tried before going live

See how Smart PPS builds a plan around your real demand, capacity, and delivery dates.